BAOYUECAN MAKING Request a quote

Buyer guide · Real reference data

Custom tin box MOQ,
pricing and tooling.

A useful price comparison keeps the size, structure, quantity and finish together. This guide explains what Baoyue’s current 10,000-piece references show, what they do not prove, and when an existing mould or custom tooling route should be reviewed.

MOQ belongs to a specification, not a generic promise.

The current Baoyue references used below are shown on a 10,000-piece or more order basis. That is useful qualification data for a buyer, but it is not a universal MOQ for every size, design or custom structure.

One artwork on an existing reference is a different production question from several artwork versions, a new special-shaped structure, a fitted insert or destination-specific packing. A quotation therefore needs the product, dimensions, quantity, artwork versions, finish and packing route together.

Compare size and structure before comparing price.

These four examples show why a pocket sliding tin, magnetic confectionery tin, tea canister and large mooncake tin cannot be compared by unit price alone.

Current referenceShown specificationOrder basisBuyer interpretation
BY-RT-013Sliding-lid candy tin86 × 32 × 23 mm
RMB ¥1.80 per piece
10,000+ pcsCompact body and sliding closure. Confirm product clearance and repeated opening. Open reference ↗
BY-RT-006Magnetic confectionery tin150 × 100 × 25 mm
RMB ¥2.50 per piece
10,000+ pcsMagnet assembly, printed lid and insert fit affect the approved project. Open reference ↗
BY-RD-019Round tea canister120 × 150 mm
RMB ¥4.75–¥5.00 per piece
10,000+ pcsFinish changes the shown price; actual fill depends on tea density and inner pack. Open reference ↗
BY-RT-021Large mooncake tin300 × 200 × 60 mm
RMB ¥8.50 per piece
10,000+ pcsInsert, cake count, wrapped size and transport fit must be approved together. Open reference ↗

A lower reference price does not mean a better project fit. Select a structure from the measured contents and required opening, then compare the complete quotation.

Six decisions change the quotation.

Provide these facts early so the manufacturer can price the same project the buyer expects to approve.

01 · Geometry

Size, shape and lid

Metal area, forming depth, corners, hinges, windows, clasps, magnetic parts and other structures change both manufacturing and assembly.

02 · Decoration

Printing and surface finish

Artwork coverage, colour control, metallic ink, matte or gloss varnish, embossing and debossing must be evaluated on the approved geometry.

03 · Internal system

Insert, divider or inner pack

A tray or insert needs its own material, tooling, fit and packing decision. It should be tested with representative finished products.

04 · Order plan

Quantity and artwork versions

State total quantity and quantity per design. Several SKUs cannot be priced as one artwork unless the production plan supports that assumption.

05 · Approval

Samples and project evidence

Fit, closure, print, colour and packed-product performance need an agreed sample route. Required documents must match the actual material and market.

06 · Delivery basis

Export packing and destination

Carton configuration, pallet needs, taxes, freight, delivery terms and destination are separate from a bare factory reference price.

Use an existing mould only when the pack actually fits.

An existing reference is a measured starting point. New tooling is considered when the usable space, proportion, opening or structural feature cannot be achieved with an available route.

  1. Existing reference

    Compare usable space first

    Check the product and inner-pack layout, formed corners, seams, lid engagement and removal clearance. Similar outside dimensions do not prove equivalent internal space.

  2. Custom tooling

    Define what must be different

    State the required dimensions or structural feature and why an existing reference does not work. Tooling feasibility, cost, sample route and timing are then confirmed for the design.

  3. Approval route

    Test the complete pack

    Approve the actual product, inner pack, insert, closure, artwork and shipping arrangement together before mass production.

Send facts that can be priced.

A useful first enquiry does not need a finished design, but it should make unknowns visible.

MOQ and price questions, answered carefully.

These answers explain the quotation process without turning a reference listing into a blanket promise.

What is the MOQ for a custom tin box?

The current Baoyue references shown in this guide use a 10,000-piece order basis. The applicable MOQ must still be confirmed for the selected dimensions, structure, artwork versions, finish, packing and tooling route.

Does using an existing tin mould guarantee a lower MOQ?

No. An existing mould can remove one tooling decision when it fits the product and pack system, but MOQ still depends on the complete production specification and order configuration.

How much does a custom tin box cost?

Reference prices are useful only when tied to the shown size and order conditions. Final price depends on dimensions, structure, tinplate and coating system, printing, finish, insert, quantity, export packing, delivery terms and destination.

When is custom tooling needed for a tin box?

Custom tooling is considered when no existing reference provides the required usable internal space, proportion, opening or structural feature. Feasibility, tooling cost, sample route and timing are confirmed for the actual design.

What should a buyer send for an accurate tin box quotation?

Send the product and inner-pack dimensions, count per tin, preferred shape or reference, estimated quantity, artwork status, finish, insert needs, destination market and required date.

Ready for a project-specific answer?

Send the product, size and quantity.
Then compare the right tin.

Request a quotation

Baoyue will review fit, existing references, tooling direction and the commercial basis against the actual project.

Planning mooncake packaging? Calculate the pack from the wrapped cakes, layout and insert ↗